Dallas-Fort Worth · intended launch market

Roofing priced from actual costs.

You pay the actual supplier and crew invoice amounts plus a $1 per square foot flat facilitation fee, with a $1,500 minimum. Permits, required inspections, and any selected add-ons appear as separate disclosed project costs.

MARKUP ON MATERIALS & LABOR
0%
FLAT FACILITATION FEE
$1/sq ft
OF INVOICES SHOWN TO YOU
100%
  • DFW intended launch · More Texas metros on waitlist
  • Crew insurance verification required
  • Material-line credential review required
  • Supplier and crew invoices itemized
The old way vs the new way

Where does the money go?

A fixed 25-square illustration shows how an itemized At-Cost quote can be compared with a single-price hypothetical contract. It is not a market average or savings claim.

Illustrative price difference
$6,250between the two fixed examples
No line-item prices shown

Hypothetical bundled quote

  • Remove and replace shingles
  • Replace underlayment
  • Replace all ventilation
Total to homeowner$15,320
Illustrative itemized quote

At-Cost Roofing

At-Cost
  • Materials, supplier invoice$3,835
  • Labor, crew invoice$2,000
  • Dump fees$385
  • Permit$100
  • Pre-build inspection$250
  • Facilitation fee$2,500
  • 5-year workmanship warrantyIncluded
Total to homeowner$9,070

These placeholder inputs are not a competitor benchmark, market-price survey, or promise of a particular price difference. An actual project is quoted to its measured roof, materials, permit and inspection requirements, and available crew rates, line by line.

Technology-first roofing

Trace where each project cost goes.

We're your contractor of record. We hire the crew, buy the materials, pull the permits, and coordinate project funding and approved payment instructions. The difference is what you can see: supplier and crew invoices, approvals, and receipts stay tied to the project record.

Your project record

See the invoice amounts behind your project price.

Supplier and crew invoices are shown at the amounts invoiced to At-Cost, separate from the flat facilitation fee. The project price does not depend on a hidden margin inside those supplier or crew lines.

Quote
What the supplier charges, what the crew charges, what we charge
Itemized
Approvals
Scope, price, and timing changes stay tied to their approval record
Recorded
Closeout
Photos, receipts, and warranty documents in one retained project file
Together
When something changes

Changes stay tied to the project record.

Rotten decking, extra materials, a schedule shift. Proposed changes to scope, price, or timing are documented with the authority and evidence that apply. When homeowner approval is required, the related work waits for it.

After the crew leaves

The paper trail that protects your investment.

When you sell the house, compare an insurance estimate, or request warranty work, the project record is designed to keep photos, receipts, permits, and warranty documents together.

Included in the flat fee

What your facilitation fee covers

  • Material ordering and supplier management
  • Crew vetting, hiring, and scheduling
  • Jobsite delivery coordination
  • Satellite and antenna coordination
  • Permit pulling (permit fees passed through at actual cost)
  • Project funding and payment coordination
  • Milestone photo documentation (tear-off, dry-in, final - yours to keep)
  • 5-year workmanship warranty
  • Manufacturer warranty registration
  • Customer portal for updates, photos, and invoices

What every job includes

Practical safeguards, documented from the start.

  • Crew insurance verification

    Coverage documentation is required before a crew can be assigned.

  • Material-line credential checks

    Crew credentials must meet requirements for the selected shingle line.

  • Funding checkpoints

    Payment instructions are gated by documented receipts or approved work milestones.

  • Full receipt access

    Supplier, crew, permit, and disposal costs stay itemized.

  • 5-year workmanship warranty

    Included in the intended service model; no extension is offered in this V0.

Insurance project-cost comparison

Compare the carrier's RCV with the project price.

At-Cost independently compares the carrier's estimate with a project price built from supplier, crew, and facilitation amounts. The comparison shows the arithmetic; it does not determine coverage, claim payments, or what an insurer will approve.

Worked example

Illustrative claim arithmetic

These fixed figures demonstrate the comparison method. They are not represented as a customer record, carrier record, market average, or expected claim outcome.

Illustrative
  • Carrier Replacement Cost Value
    $30,843
  • Depreciation withheld in the carrier estimate
    -$7,957
  • Deductible shown in the carrier estimate
    -$4,000
  • Initial ACV check from carrier
    $18,886
  • At-Cost project price
    Supplier, crew, and facilitation amounts
    -$18,225
RCV-to-project-price difference
Difference between the carrier RCV and the project price.
$12,618
Carrier estimate view
-$4,000applicable deductible shown
$30,843carrier replacement cost value

The carrier estimate shows an RCV, withheld depreciation, and an applicable deductible. The homeowner remains responsible for that deductible regardless of the contractor's project price.

At-Cost path
$0additional project price beyond the initial ACV check in this example

Here, the $18,225 project price is $661 below the initial ACV check. That arithmetic is not a promise about another claim, coverage decision, deductible treatment, or release of withheld depreciation.

The Bottom Line
In this example, the $18,886 initial ACV check exceeded the $18,225 project price by $661. The $12,618 figure is the difference between the $30,843 carrier RCV and the project price, not guaranteed savings or money the homeowner keeps.

At-Cost provides an independent project-cost comparison, not claim adjusting, coverage advice, or representation. We do not interpret coverage, negotiate with an insurer, or act as a public adjuster. You remain responsible for the applicable deductible. The insurer decides claim payments and may request proof that the deductible was paid, invoices, or proof of completed work before releasing withheld depreciation. Every claim and project is different.

Compare your carrier RCV with project cost.

Open the fixture carrier-estimate comparison. The selected file stays on your device; no analysis or email is sent.

How it works

Four steps. No hidden margin.

Aerial illustration of a home with primary-blue roof outlines and a floating quote document badge.

Request an estimate.

Step 01

Use the separate RoofQuote service for a non-binding estimate. Any later At-Cost project quote is a distinct review with no availability or turnaround promised by this demo.

Coordinated project funding

Funding instructions follow the project record.

At-Cost coordinates project funding and receipt- or milestone-gated payment instructions. The legal custody structure and production provider are not yet selected. This public fixture opens no account and moves no money.

  1. 01

    You authorize project funding.

    The full disclosed project requirement must be collected, settled, and reconciled before scheduling.

  2. 02

    Supplier payment follows delivery evidence.

    After delivery is documented, At-Cost coordinates an approved payment instruction tied to the supplier invoice and project record.

  3. 03

    Crew payment follows approved work.

    After completion and homeowner sign-off are documented, At-Cost coordinates the approved crew payment instruction.

Documentation

Every job, fully documented.

Every milestone is photographed by the crew and saved to your project record: tear-off, dry-in, and final. You can see your roof being replaced even when you're not home. The full photo package is yours to keep.

  • Stored to your project portal at every milestone.
  • Yours to download. Useful for warranty, resale, or the next claim.
Project 2841 · Fort Worth, TX
42 photos
  1. Roofer pulling back damaged underlayment to inspect OSB decking
    01Tear-off
    Decking exposed and inspected
  2. Roofers installing synthetic underlayment over fresh decking
    02Dry-in
    Underlayment and ice & water set
  3. Crew wrapping up a finished charcoal shingle roof at dusk
    03Final
    Finished roof, ridge, and flashing
Pricing

Transparent pricing. Optional work stays separate.

Every project includes the amounts invoiced to us by suppliers and crews, plus a flat facilitation fee for the work we do behind the scenes, including permit coordination, funding and payment coordination, documentation, and a 5-year workmanship warranty. Permit and inspection charges remain separate actual-cost lines. Optional services are quoted separately and can be declined.

Facilitation fee

Flat rate
$1/ square foot of measured roof area
$1,500 minimumMeasured by satellite report, not living area
What this covers
  • Material ordering and supplier management
  • Crew vetting, hiring, and scheduling
  • Jobsite delivery coordination
  • Satellite and antenna coordination
  • Permit pulling (permit fees passed through at actual cost)
  • Project funding and payment coordination
  • Milestone photo documentation (tear-off, dry-in, final - yours to keep)
  • 5-year workmanship warranty
  • Manufacturer warranty registration
  • Customer portal for updates, photos, and invoices

Change order reserve

Refundable hold

Every project carries a minimum $1,000 refundable project reserve. Larger or more complex scopes may require more. Your amount is confirmed before you sign; any unused balance is reconciled at closeout for an approved return instruction.

  • All change orders require your written approval
  • Used only for written, approved changes
  • Unused balance becomes an approved return instruction at closeout
Optional work

Quoted only when you choose it.

Availability, scope, and price must be confirmed as separate lines on your project quote. Declining an option removes it from the total. Financing is not presented as an available add-on in this V0 because no lender or production financing provider has been selected.

Separate estimate service

See the cost breakdown before project commitment.

RoofQuote collects its own estimate inputs in a separate frame. Any later At-Cost project quote is a separate review with no turnaround promised by this demo.

Start your quote
For investors and asset managers

Built for portfolios.

If you operate a portfolio, you already know how quickly reroofing details multiply. Start with property-by-property scopes, visible line items, and a single contractor of record coordinating each project.

Fixture preview only. This form does not send or create a request; avoid entering a real email address.

Property-level pricing

Each address keeps its supplier, crew, permit, and facilitation lines separate.

Property-by-property planning

Give each roof its own scope, access notes, and schedule considerations before work begins.

Portfolio coordination

Plan multiple addresses with a consistent, itemized quote format for each project.

Itemized project records

Keep supplier, crew, and permit costs visible as separate project line items.

Illustrated map of a residential neighborhood with location pins marking properties under review
Tell us which properties you are evaluating. We will use that context to discuss project scopes and coordination needs; this V0 does not create or send a request.
Trust and quality

Lean overhead. Documented standards.

The model combines a flat facilitation fee with separately itemized supplier and crew invoices. Technology supports quoting, coordination, photos, and project records while installation requirements and approvals stay documented.

Transparent by default

Supplier, crew, permit, inspection, and At-Cost fee lines stay separate so you can see what you pay for.

Efficient by design

Technology keeps quoting, coordination, photos, and project records moving without layers of office overhead.

One easy experience

As contractor of record, At-Cost coordinates crew, materials, permits, schedule, and closeout in one clear process.

FAQ

The questions you would actually ask.

If something is missing, write us. We will answer it on the record.

A clear process from quote through closeout

Ready to see the receipts?

Start with your project details and see how a quote separates supplier, crew, and permit costs from the facilitation fee. Review the format before deciding whether it fits your project.

Insurance-funded work? Compare the carrier estimate with project cost.
Get a transparent quote
Review itemized quote lines · No obligation to proceed