Hector Solis, Foreman

At-Cost ops · Sarah Chen

Tier 2 · Decking damage on 1208 Henderson

View job
  1. Flagged the back-slope decking — 3 sheets of OSB are spongy, not the 1 in the quote. Sending photos.
    9:14 AM
  2. Wide shot of back slope with three water-damaged OSB sheets
    9:14 AM
  3. Got it — picked this up. Pulling the original quote and the back-slope inspection notes now.
    9:16 AM
  4. Confirming with the supplier on a same-day OSB top-off. Will reply with go/no-go and any ticket adjustment within ~25 min.
    9:21 AM